Skip to main content
search
Category

GeoStudio

India designs world's first and largest integrated renewable energy project

India designs world’s first and largest integrated renewable energy project

Seequent's GeoStudio used to analyse slope stability and stress-deformation in a world's first design of a 1200MW pumped storage hydroelectric ...
/ Case Studies, Civil, Energy, GeoStudio
EIL tackles design for the largest underground energy storage facility in India

EIL tackles design for the largest underground energy storage facility in India

3D modelling the complex geology to design the largest underground LPG storage facility in India, is challenging ...
GeoStudio 2024.2 - What's new

GeoStudio 2024.2 – What’s new

This latest release provides important updates and new features for GeoStudio users conducting slope stability, seepage, and consolidation analysis, particularly ...
/ Civil, GeoStudio, Videos
Tech Talk: Stability Analysis of Retrogressive Landslides in 2D and 3D

Tech Talk: Stability Analysis of Retrogressive Landslides in 2D and 3D

This webinar led by Chris Kelln, covers the following: How to set up the 2D and 3D geometries with the ...
/ Civil, GeoStudio
Using GeoStudio to conduct 3D numerical analysis of groundwater seepage and stability at the Ripley Landslide site

Using GeoStudio to conduct 3D numerical analysis of groundwater seepage and stability at the Ripley Landslide site

Landslides come with significant potential for loss of life and damage to integral infrastructure. That’s why geotechnical engineers dedicate significant ...
/ Civil, Environmental, GeoStudio
an arial photo of the Semantok Dam, with the dam water on the left and the forest on the right

Solving complex geotechnical design challenges for the longest Dam in South-East Asia.

With a capacity of 33 million cubic metres of water and stretching a vast 3.1 kilometres, Indonesia’s Semantok Dam is ...
/ Civil, GeoStudio, Geotechnical, PLAXIS
Arcadis utilise digital modelling & analysis for: Iconic lifting footbridge in London’s Canary Wharf

Arcadis utilise digital modelling & analysis for: Iconic lifting footbridge in London’s Canary Wharf

Through groundbreaking digital modeling and analysis, Arcadis, achieved unprecedented efficiencies, reducing ground investigation costs by 30% and design costs by ...
GeoStudio Answer Hour: New Features in GeoStudio

GeoStudio Answer Hour: New Features in GeoStudio

GeoStudio 2024.1 continues to build on Seequent’s geotechnical analysis solution, with the addition of many new SLOPE3D features. This release ...
/ Civil, GeoStudio, Mining, Videos