Skip to main content
search
Category

Civil

The geoscience data revolution

The geoscience data revolution

Geoscience data continues to transform every aspect of the Energy, Environmental, Civil and Mining industries, and we are still in the early days of the
Filling the gaps: Why geotech and geophysics are better together

Filling the gaps: Why geotech and geophysics are better together

Clouds roll over Austria’s highest peak revealing it part by part. Andi A. Pfaffhuber has made a career piecing together a more complete view of
Talk, share, see clearly – why designers and builders of road and rail need a new approach to dealing with ground conditions

Talk, share, see clearly – why designers and builders of road and rail need a new approach to dealing with ground conditions

Transportation infrastructure presents some of the most diversely complex challenges in ground engineering – and they’re not getting any easier. A next generation step in
/ Civil, Thought leadership
Leapfrog Works Connector Out of the Box for OpenGround

Leapfrog Works Connector Out of the Box for OpenGround

Bentley and Seequent are pleased to announce that the OpenGround Connector in Leapfrog Works is now out of the Early Adopter Program (EAP) and available
/ Civil, Leapfrog Works
Creating resource  estimates doesn’t have  to be a headache

Creating resource estimates doesn’t have to be a headache

Enabling your teams to produce them internally is easier than you think You can understand your deposit in greater detail and save money Investors will
/ Civil, Leapfrog Edge, Mining
Using Leapfrog Works and Seequent Central in a BIM transportation project

Using Leapfrog Works and Seequent Central in a BIM transportation project

This workflow will cover creating a geological model in Leapfrog Works, importing and handling the interaction of BIM designs and the subsurface 3D model, and
How a highway saved costs with workbench

How a Nordic highway reduced drilling by 30% with AEM, Workbench, and machine learning

They estimated it would require around 600 boreholes for the project, and EMerald Geomodelling reduced that by 30%. That's around 200 less boreholes to do
/ Case Studies, Civil, Workbench
From a 3D Leapfrog Model to a Comprehensive Geotechnical Analysis in GeoStudio

From a 3D Leapfrog Model to a Comprehensive Geotechnical Analysis in GeoStudio

In this session, learn the following: The challenges faced by geotechnical engineers dealing with evolving site conditions How a dynamically updated digital twin enables rapid